Bollard missing since August, please replace do not fill in this hole.

Reported via mobile anonymously at 12:38, Wednesday 3 September 2025

Sent to Hackney Council less than a minute later. FixMyStreet ref: 8113158.

The, there is no bollard to stop traffic passing through here, it has been missing for weeks. Someone undid the padlock and they took the whole lot away. Please do not fill in the hole here, please put back the bollard or install a camera..

Updates

  • Sorry, missing since July!

    Posted anonymously at 12:40, Wednesday 3 September 2025

  • Dear Lesley,

    Thank you for raising this with us.

    As you're probably already aware, the bollard installed as part of the Low Traffic Neighbourhood (LTN) scheme at the junction of Clonbrock Road and Nevill Road is continually vandalised, resulting in its unauthorised removal.

    To combat this, our Design and Engineering Team is currently arranging for the site to be monitored by CCTV cameras. The infrastructure for these cameras is ​c​urrently being installed and we anticipate it should be operational within the next four weeks. This deterrent will help to discourage motorists from driving through the LTN. Any unauthorised vehicles captured driving through the LTN will be issued with a Fixed Penalty Notice.

    I hope you find this information helpful.

    Kind Regards, Paul.

    Kind Regards,

    Paul.

    Paul Cullers Senior Engineer – Highways Climate, Homes and Economy London Borough of Hackney Hackney Service Centre, 1st Floor 1 Hillman Street London E8 1DY

    Tel: 020 8356 6558 Mbl: 07510 378493

    Posted by Hackney Council at 09:45, Monday 15 September 2025

  • Dear Lesley,

    Thank you for raising this with us.

    As you're probably already aware, the bollard installed as part of the Low Traffic Neighbourhood (LTN) scheme at the junction of Clonbrock Road and Nevill Road is continually vandalised, resulting in its unauthorised removal.

    To combat this, our Design and Engineering Team is currently arranging for the site to be monitored by CCTV cameras. The infrastructure for these cameras is ​c​urrently being installed and we anticipate it should be operational within the next four weeks. This deterrent will help to discourage motorists from driving through the LTN. Any unauthorised vehicles captured driving through the LTN will be issued with a Fixed Penalty Notice.

    I hope you find this information helpful.

    Kind Regards, Paul.

    Kind Regards,

    Paul.

    Paul Cullers Senior Engineer – Highways Climate, Homes and Economy London Borough of Hackney Hackney Service Centre, 1st Floor 1 Hillman Street London E8 1DY

    Tel: 020 8356 6558 Mbl: 07510 378493

    Posted by Hackney Council at 09:45, Monday 15 September 2025

Only the original reporter may leave updates. If you made the original report please log in to leave an update.